Key Technical Specifications
| Parameter | Value |
|---|---|
| Output Points | 32, commoned |
| Nominal Voltage | 24 VDC |
| Operating Voltage Range | 16–32 VDC (max 36 VDC) |
| Rated Current | 1.7 A max per point; 7 A inrush within 10 ms |
| Minimum Load | 10 mA |
| Load Leakage | Max 4 mA |
| Voltage Drop | Typically < 2.8 VDC @ 1.7 A |
| Point Isolation | 1500 VDC |
| Module Power Draw | < 13 W |
| Redundancy | TMR — 2oo3 voting |
| Safety Rating | IEC 61508 SIL3 |
| Operating Temperature | −20 °C to +50 °C (storage −40 °C to +70 °C) |
| Humidity | 5%–95% RH, non-condensing |
| Minimum System Version | Tricon v10.2 and later |
| Termination | 16-point commoned field termination panels |
Product Introduction
Every output card in a safety system fails the same way — quietly, at 3 a.m., when the plant least expects it. The 3625 is the module I’ve seen most often blamed for a trip that never happened. Usually it wasn’t the module. It was the wiring, the termination panel, or a technician who swapped the wrong suffix.The 3625 is Triconex’s 32-point TMR digital output card, rated 24 VDC with 1.7 A per point and 1500 VDC point isolation. It’s designed for both energize-to-trip and de-energize-to-trip applications, configurable as supervised or non-supervised. Each output channel gets its own diagnostic indicator, plus module-level status LEDs for pass-through, fault, load, and activation. That diagnostic granularity is the reason I’d choose it over a generic relay card — when something misbehaves at 2 a.m., the card tells you which point.One honest note: this module is picky about its termination panel. It expects a 16-point commoned field termination assembly. Mismatch the panel and you’ll chase phantom faults for days. Also note the minimum system version — v10.2. Install it on an older Tricon and it simply won’t come up.
Quality SOP & Tech Pitfalls
The Lab Report (SOP)Standard protocol, every unit, no exceptions:
- Visual / counterfeit check — nameplate model and suffix, serial number, silkscreen quality, anti-static bag integrity
- Live test on a test rack — energize in a Tricon backplane; verify PASS, CPU, and channel LED behavior
- Insulation resistance and multimeter checks — Fluke 115 for continuity and voltage; Hi-Pot at 1500 VDC point-to-point
- Firmware / revision logging — record suffix (base / A / C1) and serial against the nameplate photo shipped with the unit
- Anti-static sealing — vacuum bag, foam, shock-rated outer carton
The Engineer’s Warning (Pitfalls)Two mistakes dominate the 3625 callouts I’ve seen.First: suffix mismatch. The base 3625, 3625A, and 3625C1 are not interchangeable in every application. Brokers sell them as one part. They aren’t. Photograph the nameplate of the card you’re replacing and match the suffix exactly.Second: ignoring the minimum load requirement. The card needs 10 mA minimum per point. Wire a high-impedance load onto it and the diagnostics will report a fault that doesn’t exist. I’ve watched a maintenance lead replace three good cards before someone measured the load current.Field disaster, real: a refinery swapped a failed 3625 for a “compatible” 3625A from a broker. The card powered up, LEDs looked healthy. Two weeks later, during a genuine ESD test, one channel refused to energize its solenoid. The trip failed. The card wasn’t defective — the termination panel was the wrong type for that suffix, and nobody had checked.
Installation & Configuration Guide
Phase 1 — Pre-Installation (⚠️)
- ⚠️ Confirm the other two TMR channels are healthy. If one is already faulted, you are one failure away from a trip.
- ⚠️ Photograph the nameplate of the old card — model, suffix, serial — and the field termination panel wiring. Every wire.
- ⚠️ Place the affected trip function in a safe state per your site’s MOC procedure. Do not pull a channel from a live 2oo3 without authorization.
- Wait 5 minutes for backplane discharge. Verify 0 VDC at the slot.
Phase 2 — Removal
- Label all field wires at the termination panel. Do not rely on color.
- Release the card’s retractable fasteners evenly. Torque spec is 10 inch-pounds — the nameplate warning says so explicitly. Under-torque and the card will not seat reliably.
- Record the slot number and the termination panel type.
Phase 3 — Installation
- Verify the suffix matches the removed card exactly. This single check prevents roughly 90% of startup failures on this platform.
- Seat the card fully until the backplane connector engages with positive resistance.
- Torque the retractable fasteners to 10 inch-pounds. Not hand-tight. Measured.
- Reconnect field wires to the same terminals. Verify against your photographs.
Phase 4 — Power-On & Testing
- Restore power. Confirm the card’s PASS and CPU LEDs indicate healthy.
- In TriStation 1131, verify the module is recognized and the channel count reads 32.
- Perform a point-by-point output test with the field load disconnected, then reconnect and re-verify.
- Record serial number, suffix, and commissioning date in your maintenance record.
Compatible Replacement Models
| Tier | Model | Notes |
|---|---|---|
| ✅ Drop-in Replacement | 3625 (same suffix, new surplus) | 100% hardware match. Match the suffix exactly. Price varies widely by channel. |
| ⚠️ Software Compatible | 3625A / 3625C1 | Same base part, different revision. Requires nameplate verification and offline channel testing before commissioning. Estimate 2–4 hours of engineer time. |
| ⚠️ Software Compatible | 3623 / 3623T | 120 VDC output modules. Different voltage class — only if your application is 120 VDC. Never substitute across voltage classes. |
| ❌ Hardware Mod Required | 3664 / 3674 | Dual or opto-isolated output modules with different termination. Requires rewiring. Do not use unless doing a full I/O reconfiguration. |
Frequently Asked Questions (FAQ)
“Is the 3625 a digital input or output module?”
Output. The OEM Tricon v9–v10 Planning and Installation Guide defines it as a 32-point TMR Digital Output Module. Some brokers list it as an input card, and others as a communication module. Those listings are wrong. Trust the OEM document.“Can I hot-swap this safely?”
The platform supports online module replacement, and the card is hot-swappable in that sense. But removing one channel from a live 2oo3 system reduces your redundancy margin to zero. If a second channel fails during your swap, you trip. Do it under a controlled MOC, with the other two channels confirmed healthy.“What’s the difference between 3625, 3625A, and 3625C1?”
Revision suffixes. Brokers treat them as interchangeable. They aren’t always. Match the suffix on the card you’re replacing. If you must cross-reference, test the candidate card offline before commissioning.“My replacement card powers up but reports a channel fault. What now?”
Check three things, in this order: termination panel type, minimum load current (10 mA per point), and torque on the retractable fasteners. Ninety percent of the time it’s one of those three, not a defective card.“Will this work on my Tricon system?”
Only on v10.2 and later. The OEM guide is explicit. If your system is older, this card will not come up. Check your system version before ordering.“What warranty should I expect?”
Surplus channels typically offer 6–12 months. Get it in writing, and specify that coverage includes channel-by-channel output testing, not just “powers up.”Disclaimer: Parameters compiled from the OEM Tricon v9–v10 Planning and Installation Guide and reseller nameplate sources. Reseller listings conflict on module type (digital output vs. digital input vs. communication module) and operating temperature. Final selection must be based on the OEM manual and the physical nameplate. For safety-instrumented applications, engage a certified functional safety engineer.